Skip to main content Skip to search Skip to main navigation
Bewertungsdurchschnitt mit

Average rating of 4.9 out of 5 stars

(4.91/5.00) aus insgesamt 2934 Bewertungen

Chromium

Our High Gloss Chrome redefines the standard. Through a precise multilayer process of polishing, nickel plating, and chrome plating, a flawless "Mirror Finish" is created. The surface impresses with its cool, bluish-silver shine and extreme hardness. Thanks to passing the 24-hour salt spray test (NSS), we guarantee maximum corrosion protection and ...

Skip product gallery

Kunden kauften auch

Skip product gallery

Kunden kauften auch

Concealed Body

  • Compatible with fixtures from PaulGurkes for PGBASIC
  • Installation depth: 83-108mm
  • Made of solid brass
  • Integrated level for easy installation
  • Includes sealing sleeve for waterproofing

Installation Instructions

Connect the consumers according to the following specifications:

2-Way Fixture:

  • Top outlet: overhead shower
  • Bottom outlet: hand shower

Concealed Mixing Valve

  • Made of solid brass
  • High-quality chrome finish
  • Nostalgia design with modern technology
  • Suitable for 2 consumers, e.g., overhead and hand shower
  • Switching consumers by pressing the diverter
  • Vibration dampener for noise reduction
  • Required body PGBASIC
  • Durable ceramic cartridge

Overhead Shower

  • Nostalgic design
  • Made of solid brass
  • High-quality chrome finish
  • Ø 20 cm
  • 140 anti-limescale nozzles
  • ECO flow limiter max. 10 L/min
  • 1/2" ball joint

Shower Arm

  • Made of solid brass
  • High-quality chrome finish
  • Projection approx. 46 cm
  • Ø pipe 22 mm
  • Ø wall rose 8.5 cm
  • 1/2" thread

Wall Connection Elbow

  • Made of solid brass
  • High-quality chrome finish
  • Beautiful ceramic insert
  • Backflow prevention according to DIN EN 1717
  • 1/2" external thread

Shower Holder

  • Nostalgic design
  • Made of solid metal
  • High-quality chrome finish
  • Ceramic insert with border
  • Adjustable angle of the holder (ball joint)
  • 1 drill hole required

Hand Shower

  • Made of solid brass
  • Chrome-plated
  • Handle made of ceramic with border
  • 1 function
  • 20 cm long
  • Head Ø 7.2 cm

Shower Hose

  • Made of stainless steel
  • Conical and hex nut made of brass
  • High-quality chrome finish
  • Conical with rubber protection
  • Length 150 cm
  • 1/2" thread

Versand

  • Versandgewicht: 7.25 Kg
  • Versandart: Paket

Produktsicherheitsverordnung

Angaben zum Hersteller:

Name des Herstellers: PaulGurkes GmbH

Postanschrift: Bördestr. 7, 31135 Hildesheim, Deutschland

Elektronische Adresse: anfrage@paulgurkesshop.de


Letztes Update: 18.04.2026, 17:04:20

PaulGurkes Concealed Body for Faucets up to 4-Way

PGBASIC

€99.00*

PaulGurkes Concealed Mixer 2-Way Nostalgia Retro for Base Unit

PGNX2W

€179.00*

PaulGurkes Nostalgia Retro 20cm Shower Head

PGHPRETRO083

€107.90*

PaulGurkes Wall Arm for Shower Heads

PGMW3

€69.90*

PaulGurkes Nostalgia Shower Holder Ceramic Retro

PGMW5

€39.90*

PaulGurkes Retro Nostalgia Hand Shower with Ceramic Handle in Brass

PG0316

€49.00*

PaulGurkes Shower Hose 1.5m 150cm

PGH150

€19.90*

PaulGurkes Nostalgia Wall Connector with Ceramic Hose Connection

PGWABNX-ARB

€79.00*

Dokumente der im Set enthaltenen Produkte

PGBASIC

[pdf] PGBASIC-v1.2
Components
Nr. Komponente AnzahlNo. Component Quantity
1 Wasserwaage 21 Spirit level 2
2 Pappkarte 12 Cardboard 1
3 Wasserwaagenrahmen 13 Spirit level frame 1
4 Schraube 64 Screw 6
5 Spülvorrichtung 15 Flushing device 1
6 Dichtung für Spülvorrichtung 16 Seal for flushing device 1
8 Dichtmanschette 18 Sealing collar 1
9 Grundkörper 19 Basic body 1
10 Spreizbolzen 410 Expansion bolt 4
11 Innensechskantschlüssel 111 Allen key 1
12 Verschlussstopfen 312 Closure plugs 3
13 Montageanleitung 113 Assembly instructions 1
Zertifikat & Videoanleitung unter: 14 www.PaulGurkesShop.de 1Certificate & video instructions at: 14 www.PaulGurkesShop.de 1
Installation Preparation
Installationsvorbereitung • Für die Installation der Box wird ein Loch von mindestens 200mm x 220mm benötigt. • Die Einbautiefe beträgt 83mm - 108mm. • Bereiten Sie die Leitungen wie in der folgenden Abbildung vor. • Der Druck sollte 0,5 - 10 Bar nicht überschreiten. Empfohlener Druck ist 5 Bar.Installation preparation • A hole of at least 200mm x 220mm is required to install the box. • The installation depth is 83mm - 108mm. • Prepare the pipes as shown in the following figure. • The pressure should not exceed 0.5 - 10 bar. Recommended pressure is 5 bar.
Installation Step - Preparation
1. Installationsschritt - Vorbereitung • Merke: Die Box ist standardmäßig für vier Ausgänge konfiguriert. Für eine Nutzung von einem / zwei oder drei Ausgängen blockieren Sie die Ausgänge wie im unteren Schaubild abgebildet. • Bohren Sie die Installationslöcher, wie in der Abbildung zu sehen ist. • Platzieren Sie nun die Box in dem Installationsloch und fixieren Sie diese mit den Spreizschrauben. • Für die Installation in eine Ständerwand montieren Sie die Box wie im oberen Schaubild. • Überprüfen Sie die Festigkeit der Schrauben. • Schließen Sie die Warmwasser und Kaltwasser Leitungen an. • Schließen Sie die Verbraucher nach dem unteren Schaubild an.1. Installation step - Preparation • Note: The box is configured for four outlets as standard. For use with one / two or three outlets, block the outlets as shown in the diagram below. • Drill the installation holes as shown in the figure. • Now place the box in the installation hole and fix it with the expansion screws. • For installation in a stud wall, mount the box as shown in the diagram above. • Check the tightness of the screws. • Connect the hot and cold water pipes. • Connect the consumers according to the diagram below.
Installation Step - Function Overview
2. Installationsschritt - Funktionsübersicht2. Installation step - Function overview
Important Notes
WICHTIG! • Der untere Ausgang wird zuerst angesteuert (bei 2-Wege Armaturen). • Überprüfen Sie die Richtigkeit der Ausgänge an den Verbrauchern vor dem Verputzen in Abhängigkeit der zur Verwendung geplanten Armatur!IMPORTANT! • The lower outlet is activated first (for 2-way fittings). • Check that the outlets are correct for the consumers before plastering, depending on the fitting you plan to use!
Installation Step - Testing
2. Installationsschritt - Testen • Öffnen Sie die Wasserleitungen und prüfen Sie die Montage auf Dichtheit. • Demontieren Sie die Spülvorrichtung und entfernen Sie die Gummistopfen aus dem Grundkörper. • Montieren Sie die Verschlusskappe erneut und spülen Sie 3 Minuten die Leitungen, um diese von Verschmutzungen zu säubern.2. Installation step - Testing • Open the water pipes and check the installation for leaks. • Dismantle the flushing device and remove the rubber plugs from the main body. • Reassemble the cap and flush the pipes for 3 minutes to remove any dirt.
Installation Step - Plastering
3. Installationsschritt - Verputzen • Wenn die Installation die Dichtheitsprüfung bestanden hat, verputzen Sie die Montage. • Kontrollieren Sie die Position der Box. • Dichten Sie nun die Box im Verbund ab, bevor Sie die Fließen an die Wand bringen. • Verfliesen Sie die Installation. • Schneiden Sie das überstehende Material der Box ab. • Dichten Sie zuletzt die Schnittkante ab. • Die Installation ist abgeschlossen. Montieren Sie nun die Armatur.3. Installation step - Plastering • If the installation has passed the leak test, plaster the assembly. • Check the position of the box. • Now seal the box in the composite before you bring the tiles to the wall. • Tile the installation. • Cut off the overhanging material of the box. • Finally, seal the cut edge. • The installation is complete. Now mount the fitting.
Important Legal Information
WICHTIG! • Beachten Sie bei der Installation alle erforderlichen gesetzlichen und nationalen Bestimmungen (anerkannte Regeln der Technik) und halten Sie diese ein.IMPORTANT! • When installing, observe all the necessary legal and national regulations (recognized rules of technology) and adhere to them.
[pdf] PGBASIC-Anschlussplan-v1.0
Anschlussplan für PGBASICConnection diagram for PGBASIC
MontagehinweiseInstallation instructions
HinweiseNotes
Beachten Sie bei der Montage unbedingt die beiliegenden Installationsanleitungen.When installing, be sure to observe the enclosed installation instructions.
Prüfen Sie die Montage unbedingt vor dem Fliesenlegen auf Korrektheit der Verbraucher!Check the installation before tiling to ensure the consumer unit is correct!
Prüfen Sie die Montage des Grundkörpers in Hinsicht auf die zur Verwendung geplanten Komponenten.Check the installation of the base unit with regard to the components planned for use.
Duschsystem 2-Wege2-way shower system
Duschsystem 3-Wege3-way shower system
Wasserfall DuschsystemWaterfall shower system
Wannenset 2-Wege2-way tub set
Duschsystem 4-Wege4-way shower system
WanneneinlaufTub inlet
RegenduscheRain shower
HandbrauseHand shower
RegenfallRainfall
geblocktblocked
WasserfallWaterfall
Verbraucher 4Consumer 4
[pdf] PGBASIC-Durchflussmengen
Flow Rates for PGBASIC
Durchflussmengen für PGBASICFlow Rates for PGBASIC
Durchflussmengen in l/minFlow rates in l/min
Single Lever Mixer (2-Way)
Einhandmischer (2-Wege)Single Lever Mixer (2-Way)
Bar Ausgang Warm Gemisch KaltBar Outlet Warm Mixed Cold
B 9,5 10,3 8,8B 9.5 10.3 8.8
1 D 9,6 10,6 8,91 D 9.6 10.6 8.9
B 16,7 18,3 15,4B 16.7 18.3 15.4
3 D 17 18,7 15,73 D 17 18.7 15.7
Thermostat Fittings (2-Way + 3-Way)
Thermostatarmaturen (2-Wege + 3-Wege)Thermostat Fittings (2-Way + 3-Way)
Bar Ausgang Warm Gemisch KaltBar Outlet Warm Mixed Cold
B 8 12,2 9,3B 8 12.2 9.3
1 C 8 12 9,21 C 8 12 9.2
D 7,8 12,5 9D 7.8 12.5 9
B 14,2 22,3 16,5B 14.2 22.3 16.5
3 C 14 21,8 16,33 C 14 21.8 16.3
D 14,6 22,5 16,6D 14.6 22.5 16.6
Selector Fittings (2-Way + 3-Way)
Selectarmaturen (2-Wege + 3-Wege)Selector Fittings (2-Way + 3-Way)
Bar Ausgang Warm Gemisch KaltBar Outlet Warm Mixed Cold
B 14,6 17,4 14,6B 14.6 17.4 14.6
3 C 16,5 20,2 16,93 C 16.5 20.2 16.9
D 15,6 18,6 15,9D 15.6 18.6 15.9
Single Lever Mixer (4-Way)
Einhandmischer (4-Wege)Single Lever Mixer (4-Way)
Bar Ausgang Warm Gemisch KaltBar Outlet Warm Mixed Cold
A 9,3 10,3 9,8A 9.3 10.3 9.8
B 9,2 10,2 9,7B 9.2 10.2 9.7
1 C 9,4 10,4 9,81 C 9.4 10.4 9.8
D 9,7 10,7 10D 9.7 10.7 10
A 16,8 18,7 17,8A 16.8 18.7 17.8
B 16,6 18,5 17,6B 16.6 18.5 17.6
3 C 16,8 18,7 17,83 C 16.8 18.7 17.8
D 17,3 19,5 18,3D 17.3 19.5 18.3
[pdf] Analysebericht-PGBASIC
Analysis Report
AnalyseberichtAnalysis Report
Die Probe wurde mittels Röntgenfluoreszenzanalyse getestet und hat folgendes Messergebnis erbracht.The sample was tested using X-ray fluorescence analysis and yielded the following measurement result.
Report Information
Bericht-Nr.: #2017-749Report No.: #2017-749
Herstellernummer: PGBASICManufacturer number: PGBASIC
Material Composition
Kupfer Cu 58,679 ± 0,573 57,000 60,000Copper Cu 58.679 ± 0.573 57.000 60.000
Zink Zn 39,262 ± 0,512 37,000 41,500Zinc Zn 39.262 ± 0.512 37.000 41.500
Blei Pb 1,727 ± 0,173 1,600 2,200Lead Pb 1.727 ± 0.173 1.600 2.200
Eisen Fe 0,153 ± 0,049 0,000 0,300Iron Fe 0.153 ± 0.049 0.000 0.300
Zinn Sn 0,114 ± 0,074 0,000 0,300Tin Sn 0.114 ± 0.074 0.000 0.300
Nickel Ni 0,064 ± 0,041 0,000 0,100Nickel Ni 0.064 ± 0.041 0.000 0.100
Aluminium Al 0,000 0,050Aluminum Al 0.000 0.050
Compliance and Standards
Der Nachweis über die Eignung in Trinkwasserinstallationen nach Trinkwasserverordnung (TrinkwV 2001) ist somit erbracht.The proof of suitability for drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) is thus provided.
Das geprüfte Material entspricht den Vorgaben des Umweltbundesamtes bezüglich der „Bewertungsgrundlagen für metallene Werkstoffe im Kontakt mit Trinkwasser“- UBA- Positivliste. Der Werkstoff erfüllt laut Umweltbundesamt die Norm DIN 50930-6, die Aussagen bezüglich der Korrosionsbeständigkeit darlegt.The tested material complies with the requirements of the Federal Environment Agency regarding the "Assessment criteria for metallic materials in contact with drinking water" - UBA positive list. According to the Federal Environment Agency, the material meets the DIN 50930-6 standard, which provides information on corrosion resistance.
Material Identification
Werkstoff: CW617N (CuZn40Pb2)Material: CW617N (CuZn40Pb2)
Signatures
Olaf Manusch GeschäftsführerOlaf Manusch Managing Director
Hildesheim, 2. Dezember 2017Hildesheim, December 2, 2017
Marc Manusch Leitung Technik & QualitätswesenMarc Manusch Head of Technology & Quality Assurance
Legal Note
Umweltbundesamt: „Bewertungsgrundlage für metallene Werkstoffe im Kontakt mit Trinkwasser“, (abgerufen am 03.04.2017).Federal Environment Agency: "Assessment basis for metallic materials in contact with drinking water", (accessed on 04/03/2017).
[pdf] PGBASIC_Anordnungsplan
Komponentenliste
Sonstiges
Produktanleitungen - PGBASIC - Version 1
Connection Diagram for PGBASIC
Connection Diagram for PGBASIC v1.0 of 1
Installation Instructions
Installation Instructions Be sure to follow the included installation instructions during assembly.
Check the assembly carefully before tiling to ensure correct placement of the consumers!
Check the assembly of the basic body with regard to the components planned for use.
Notes
Notes Hand shower blocked blocked
Rain shower hand shower blocked
Rain shower bathtub inlet hand shower blocked blocked
Bathtub inlet rain waterfall hand shower blocked
Shower system 3-way
Shower system 2-way bathtub set 2-way waterfall
Shower system shower system 4-way hand shower rain shower bathtub inlet consumer 4
Produktanleitungen - PGBASIC - Version 1.2
Analyseberichte - PGBASIC - Version 1
Product Information
Produktname: PaulGurkes Unterputz Grundkörper für Armaturen bis 4-Wege Product Name: PaulGurkes In-Wall Rough-In Body for Fixtures up to 4-Way
Artikelnummer: PGBASIC Article Number: PGBASIC
Version: v1.2 Version: v1.2
Components
1 - Wasserwaage - 2 1 - Spirit Level - 2
2 - Pappkarte - 1 2 - Cardboard Card - 1
3 - Wasserwaagenrahmen - 1 3 - Spirit Level Frame - 1
4 - Schraube - 6 4 - Screw - 6
5 - Spülvorrichtung - 1 5 - Flush Device - 1
6 - Dichtung für Spülvorrichtung - 1 6 - Seal for Flush Device - 1
7 - Pin - 2 7 - Pin - 2
8 - Dichtmanschette - 1 8 - Sealing Cuff - 1
9 - Grundkörper - 1 9 - Rough-In Body - 1
10 - Spreizbolzen - 4 10 - Expansion Bolt - 4
11 - Innensechskantschlüssel - 1 11 - Hex Key - 1
12 - Verschlussstopfen - 3 12 - Closure Plug - 3
13 - Montageanleitung - 1 13 - Assembly Instructions - 1
14 - Zertifikat & Videoanleitung unter: www.PaulGurkesShop.de 14 - Certificate & Video Instructions at: www.PaulGurkesShop.de
Installation Preparation
Für die Installation der Box wird ein Loch von mindestens 200mm x 220mm benötigt. A hole of at least 200 mm x 220 mm is required for box installation.
Die Einbautiefe beträgt 83mm - 108mm. Installation depth is 83 mm - 108 mm.
Bereiten Sie die Leitungen wie in der folgenden Abbildung vor. Prepare the lines as shown in the following figure.
Der Druck sollte 0,5 - 10 Bar nicht überschreiten. Empfohlener Druck ist 5 Bar. Pressure should not exceed 0.5 - 10 bar. Recommended pressure is 5 bar.
Step 1 of Installation - Preparation
Die Box ist standardmäßig für vier Ausgänge konfiguriert. Für eine Nutzung von einem / zwei oder drei Ausgängen blockieren Sie die Ausgänge wie im unteren Schaubild abgebildet. The box is configured by default for four outlets. For use of one, two, or three outlets, block the outlets as shown in the diagram below.
Bohren Sie die Installationslöcher, wie in der Abbildung zu sehen ist. Drill the installation holes as shown in the illustration.
Platzieren Sie nun die Box in dem Installationsloch und fixieren Sie diese mit den Spreizschrauben. Now place the box in the installation hole and secure it with the expansion bolts.
Für die Installation in eine Ständerwand montieren Sie die Box wie im oberen Schaubild. For installation in a stud wall, mount the box as shown in the upper diagram.
Überprüfen Sie die Festigkeit der Schrauben. Check the tightness of the screws.
Analysis Report
Analysebericht The sample was tested using X-ray fluorescence analysis and produced the following measurement result. The suitability of the product for use in drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) is thus proven. The tested material meets the requirements of the German Federal Environment Agency (UBA) concerning "Assessment bases for metallic materials in contact with drinking water" – UBA positive list. The material complies with DIN 50930-6 standard according to the German Federal Environment Agency, which provides statements regarding corrosion resistance.
Material and Designation
Material: CW617N (CuZn40Pb2)
Manufacturer Number: PGBASIC
EAN: 4250914808827
Report No.: #2017-749
Measurement Results
Analysis Report: XL2-99147
Measurement No.: 749
Mode: Alloys
Measurement Duration: 8.6s
Time: 02.12.2017 11:48:23
Manufacturer Number: pgbasic
Material Suggestion: CW617N_CuZn40Pb2
Element Analysis
Element % ± 2σ Min Max
Copper Cu 58.679 ± 0.573 57.000 60.000
Zinc Zn 39.262 ± 0.512 37.000 41.500
Lead Pb 1.727 ± 0.173 1.600 2.200
Iron Fe 0.153 ± 0.049 0.000 0.300
Tin Sn 0.114 ± 0.074 0.000 0.300
Nickel Ni 0.064 ± 0.041 0.000 0.100
Aluminum Al 0.000 0.050
Signatory and Contact
Signatory: Olaf Manusch, Managing Director
Engineering and Quality Management: Marc Manusch, Engineering and Quality Management
Company: PaulGurkes GmbH, Klingenbergstr. 12, 31139 Hildesheim
User Login: Marc Manusch
Date: Hildesheim, December 2, 2017
Anordnungspläne - PGBASIC - Version 1
Components
1 8PM4X16 1 8PM4X16
2 81BE0000 2 81BE0000
3 80BE0000 3 80BE0000
4 8J128X18A 4 8J128X18A
5 81T23187 5 81T23187
6 85BK001 6 85BK001
7 82BE0000 7 82BE0000
8 8J103X16A 8 8J103X16A
9 8XJBE001 9 8XJBE001
10 84BE0000 10 84BE0000
11 8PM5X12 11 8PM5X12
12 85BE0000 12 85BE0000
13 103BE000 13 103BE000
14 88BM0000 14 88BM0000
15 8XJBE002 15 8XJBE002
16 83BE0000 16 83BE0000
17 8JT1A2D2 17 8JT1A2D2
18 8J22X24A 18 8J22X24A
19 8BS40X112 19 8BS40X112
20 8STG605 20 8STG605
Temperature Ranges
Max Mixed Cold Hot 108 Max Mixed Cold Hot 108
Min Mixed Mixed Mixed 80 Min Mixed Mixed Mixed 80
Manufacturer
PaulGurkes GmbH PaulGurkes GmbH
Sonstige Dokumente - PGBASIC - Version 1
Flow Rates for PGBASIC
v1.0 v1.0
Thermostatic Mixers (2-way + 3-way)
Bar Outlet Hot Water Mixed Cold Water
1 B 8 12,2 9,3
1 C 8 12 9,2
1 D 7,8 12,5 9
3 B 14,2 22,3 16,5
3 C 14 21,8 16,3
3 D 14,6 22,5 16,6
Single-Lever Mixer (2-way)
Bar Outlet Hot Water Mixed Cold Water
1 B 9,5 10,3 8,8
1 D 9,6 10,6 8,9
3 B 16,7 18,3 15,4
3 D 17 18,7 15,7
Select Mixers (2-way + 3-way)
Bar Outlet Hot Water Mixed Cold Water
3 B 14,6 17,4 14,6
3 C 16,5 20,2 16,9
3 D 15,6 18,6 15,9
Single-Lever Mixer (4-way)
Bar Outlet Hot Water Mixed Cold Water
1 A 9,3 10,3 9,8
1 B 9,2 10,2 9,7
1 C 9,4 10,4 9,8
1 D 9,7 10,7 10
3 A 16,8 18,7 17,8
3 B 16,6 18,5 17,6
3 C 16,8 18,7 17,8
3 D 17,3 19,5 18,3

PGNX2W

[pdf] PGNX2W-v1.0
Components
Nr. Komponente AnzahlNo. Component Quantity
1 Griff 11 Handle 1
2 Madenschraube 12 Grub screw 1
4 Umstellerknopf 14 Diverter knob 1
5 Blende 15 Cover 1
6 Dichtung 16 Seal 1
7 Dichtung 17 Seal 1
8 Schraube 48 Screw 4
9 Fliesenspiegel 19 Tile trim 1
10 Dichtung 110 Seal 1
11 Armatur 111 Fitting 1
12 Dichtung 612 Seal 6
13 Schlüssel 213 Key 2
Zertifikat unter: www.paulgurkesshop.de 1Certificate at: www.paulgurkesshop.de 1
15 Anleitung 115 Instructions 1
Installation Steps
Installationsschritte • Nach der Installation der Unterputz-Box und Prüfung auf Dichtheit ist das Wasser abzustellen. • Entfernen Sie den Schutz der Box. Montieren Sie die Armatur wie im zweiten Schaubild. • Ziehen Sie die Schrauben fest an, vergessen Sie die O-Ringe nicht. • Montieren Sie nun die Abdeckungen wie im dritten Bild. Justieren Sie die Abdeckung, bevor Sie diese fixieren. • Installieren Sie die Blende der Armatur wie im letzten Installationsbild. • Montieren Sie nun den Rest der Armatur.Installation Steps • After installing the concealed box and checking for leaks, turn off the water. • Remove the cover from the box. Mount the fitting as shown in the second diagram. • Tighten the screws, don't forget the O-rings. • Now mount the covers as shown in the third picture. Adjust the cover before fixing it. • Install the cover of the fitting as shown in the last installation picture. • Now mount the rest of the fitting.
Switching Outlets
Ausgänge schalten • Ohne betätigen des Umstellers ist der untere Ausgang des Grundkörpers aktiv (Handbrause). • Durch Drücken des Umstellers ist der obere Ausgang des Grundkörpers aktiv (Kopfbrause).Switching Outlets • Without actuating the diverter, the lower outlet of the basic body is active (hand shower). • By pressing the diverter, the upper outlet of the basic body is active (head shower).
Regulating Water
Wasser regeln • Regeln Sie die Intensität indem Sie den Griff anwinkeln. Durch Bewegen des Griffs nach links (warm) und rechts (kalt) regeln Sie die Temperatur.Regulating Water • Regulate the intensity by angling the handle. Regulate the temperature by moving the handle to the left (warm) and to the right (cold).
Cleaning & Maintenance
Säuberung & Wartung Um eine gleichbleibende Qualität zu gewährleisten, ist folgendes zu beachten: • Mit sauberem Wasser abspülen & mit Mikrofasertuch trocknen. • Schmutz nur mit milden Reinigungsmitteln entfernen. • Benutzen Sie keine Scheuermilch, Polierpaste, Papiertücher, etc. • Benutzen Sie keine säurehaltigen Reinigungsmittel oder Seife.Cleaning & Maintenance To ensure consistent quality, please note the following: • Rinse with clean water & dry with a microfiber cloth. • Only remove dirt with mild detergents. • Do not use scouring milk, polishing paste, paper towels, etc. • Do not use any acidic cleaning agents or soap.
PaulGurkes Quality
PaulGurkes Qualität • Herzlichen Glückwunsch zum Kauf Ihres PaulGurkes Qualitätsproduktes. Unsere Produkte sind technisch ausgereift und unter Verwendung hochwertiger Materialien gefertigt. • Jedes Produkt unterzieht sich einer handverlesenen Qualitätskontrolle. • Sollten Sie mit unseren Produkten nicht zufrieden sein, kontaktieren Sie uns.PaulGurkes Quality • Congratulations on purchasing your PaulGurkes quality product. Our products are technically sophisticated and manufactured using high-quality materials. • Each product undergoes a hand-picked quality control. • If you are not satisfied with our products, please contact us.
Disclaimer
Wir behalten uns das Recht vor, Aktualisierungen, Änderungen oder Ergänzungen an den bereitgestellten Informationen und Daten vorzunehmen.We reserve the right to make updates, changes or additions to the information and data provided.
[pdf] Analysebericht-PGNX2W
Analysis Report Header
AnalyseberichtAnalysis Report
Introduction
Die Probe wurde mittels Röntgenfluoreszenzanalyse getestet und hat folgendes Messergebnis erbracht.The sample was tested using X-ray fluorescence analysis and yielded the following measurement result.
Report Information
Bericht-Nr.: #2018-909Report No.: #2018-909
Herstellernummer: PGNX2WManufacturer Number: PGNX2W
Material Composition Analysis
Kupfer Cu 60,095 ± 0,549 58,000 63,000Copper Cu 60.095 ± 0.549 58.000 63.000
Zink Zn 38,483 ± 0,485 33,500 41,500Zinc Zn 38.483 ± 0.485 33.500 41.500
Blei Pb 1,231 ± 0,143 0,200 1,400Lead Pb 1.231 ± 0.143 0.200 1.400
Eisen Fe 0,084 ± 0,039 0,000 0,300Iron Fe 0.084 ± 0.039 0.000 0.300
Nickel Ni 0,068 ± 0,039 0,000 0,200Nickel Ni 0.068 ± 0.039 0.000 0.200
Mangan Mn 0,037 ± 0,039 0,000 0,050Manganese Mn 0.037 ± 0.039 0.000 0.050
Zinn Sn 0,000 ± 0,091 0,000 0,500Tin Sn 0.000 ± 0.091 0.000 0.500
Silizium Si 0,000 0,050Silicon Si 0.000 0.050
Aluminium Al 0,300 0,900Aluminum Al 0.300 0.900
Compliance Statement
Der Nachweis über die Eignung in Trinkwasserinstallationen nach Trinkwasserverordnung (TrinkwV 2001) ist somit erbracht.The proof of suitability for drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) is thus provided.
Das geprüfte Material entspricht den Vorgaben des Umweltbundesamtes bezüglich der „Bewertungsgrundlagen für metallene Werkstoffe im Kontakt mit Trinkwasser“- UBA-Positivliste. Der Werkstoff erfüllt laut Umweltbundesamt die Norm DIN 50930-6, die Aussagen bezüglich der Korrosionsbeständigkeit darlegt.The tested material complies with the requirements of the German Environment Agency (Umweltbundesamt) regarding the "assessment basis for metallic materials in contact with drinking water" - UBA positive list. According to the German Environment Agency, the material meets the DIN 50930-6 standard, which provides information on corrosion resistance.
Material Designation
Werkstoff: CC757S (CuZn39Pb1Al-C)Material: CC757S (CuZn39Pb1Al-C)
Footer Information
Olaf Manusch GeschäftsführerOlaf Manusch Managing Director
Hildesheim, Montag, 8. Oktober 2018Hildesheim, Monday, October 8, 2018
Marc Manusch Leitung Technik & QualitätswesenMarc Manusch Head of Technology & Quality Assurance
Umweltbundesamt: „Bewertungsgrundlage für metallene Werkstoffe im Kontakt mit Trinkwasser“, (abgerufen am Montag, 8. Oktober 2018).German Environment Agency: "Assessment basis for metallic materials in contact with drinking water", (accessed on Monday, October 8, 2018).
[pdf] PGNX2W_Anordnungsplan.pdf
Component List
Analyseberichte - PGNX2W - Version 1
Analysis Report
Die Probe wurde mittels Röntgenfluoreszenzanalyse getestet und hat folgendes Messergebnis erbracht. Der Nachweis über die Eignung in Trinkwasserinstallationen nach Trinkwasserverordnung (TrinkwV 2001) ist somit erbracht. Das geprüfte Material entspricht den Vorgaben des Umweltbundesamtes bezüglich der „Bewertungsgrundlagen für metallene Werkstoffe im Kontakt mit Trinkwasser"- UBA- Positivliste. Der Werkstoff erfüllt laut Umweltbundesamt die Norm DIN 50930-6, die Aussagen bezüglich der Korrosionsbeständigkeit darlegt. The sample was tested by X-ray fluorescence analysis and yielded the following measurement result. The demonstration of suitability in drinking water installations according to the Drinking Water Regulation (TrinkwV 2001) is hereby provided. The tested material complies with the requirements of the Federal Environmental Agency regarding "Assessment criteria for metallic materials in contact with drinking water" - UBA positive list. According to the Federal Environmental Agency, the material meets the DIN 50930-6 standard, which addresses corrosion resistance.
Material and Identification
Werkstoff: CC757S (CuZn39Pb1Al-C) Material: CC757S (CuZn39Pb1Al-C)
Bericht-Nr.: #2018-909 Report No.: #2018-909
Herstellernummer: PGNX2W Manufacturer Number: PGNX2W
EAN: 4250914810318 EAN: 4250914810318
Analysis Report Measured Values
Analysenbericht: XL2-99147 Analysis Report: XL2-99147
Messung Nr.: 909 Measurement No.: 909
Modus: Legierungen Mode: Alloys
Messdauer: 9,0s Measurement Duration: 9.0s
Zeit: 08.10.2018 14:14:47 Time: 08.10.2018 14:14:47
Herstellernummer: pgnx2w Manufacturer Number: pgnx2w
User Login: Marc Manusch User Login: Marc Manusch
Werkstoffvorschlag: CC575S_CuZn39Pb1Al Material Suggestion: CC575S_CuZn39Pb1Al
Element Analysis
Kupfer Cu: 60,095 ± 0,549 (Min: 58,000 | Max: 63,000) Copper Cu: 60.095 ± 0.549 (Min: 58.000 | Max: 63.000)
Zink Zn: 38,483 ± 0,485 (Min: 33,500 | Max: 41,500) Zinc Zn: 38.483 ± 0.485 (Min: 33.500 | Max: 41.500)
Blei Pb: 1,231 ± 0,143 (Min: 0,200 | Max: 1,400) Lead Pb: 1.231 ± 0.143 (Min: 0.200 | Max: 1.400)
Eisen Fe: 0,084 ± 0,039 (Min: 0,000 | Max: 0,300) Iron Fe: 0.084 ± 0.039 (Min: 0.000 | Max: 0.300)
Nickel Ni: 0,068 ± 0,039 (Min: 0,000 | Max: 0,200) Nickel Ni: 0.068 ± 0.039 (Min: 0.000 | Max: 0.200)
Mangan Mn: 0,037 ± 0,039 (Min: 0,000 | Max: 0,050) Manganese Mn: 0.037 ± 0.039 (Min: 0.000 | Max: 0.050)
Zinn Sn: 0,000 ± 0,091 (Min: 0,000 | Max: 0,500) Tin Sn: 0.000 ± 0.091 (Min: 0.000 | Max: 0.500)
Silizium Si: (Min: 0,000 | Max: 0,050) Silicon Si: (Min: 0.000 | Max: 0.050)
Aluminium Al: (Min: 0,300 | Max: 0,900) Aluminum Al: (Min: 0.300 | Max: 0.900)
Contact Information
Geschäftsführer: Olaf Manusch Managing Director: Olaf Manusch
Leitung Technik & Qualitätswesen: Marc Manusch Head of Engineering & Quality Management: Marc Manusch
Adresse: Klingenbergstr. 12, 31139 Hildesheim Address: Klingenbergstr. 12, 31139 Hildesheim
Datum: Hildesheim, Montag, 8. Oktober 2018 Date: Hildesheim, Monday, October 8, 2018
Analyseberichte - PGNX2W - Version 1
Analysis Report
Die Probe wurde mittels Röntgenfluoreszenzanalyse getestet und hat folgendes Messergebnis erbracht. Der Nachweis über die Eignung in Trinkwasserinstallationen nach Trinkwasserverordnung (TrinkwV 2001) ist somit erbracht. The sample was tested using X-ray fluorescence analysis and yielded the following measurement result. The proof of suitability for use in drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) is hereby established.
Das geprüfte Material entspricht den Vorgaben des Umweltbundesamtes bezüglich der „Bewertungsgrundlagen für metallene Werkstoffe im Kontakt mit Trinkwasser"- UBA-Positivliste. The tested material complies with the requirements of the Federal Environmental Agency regarding "Assessment criteria for metallic materials in contact with drinking water" - UBA positive list.
Der Werkstoff erfüllt laut Umweltbundesamt die Norm DIN 50930-6, die Aussagen bezüglich der Korrosionsbeständigkeit darlegt. The material meets the standard DIN 50930-6 according to the Federal Environmental Agency, which sets forth requirements regarding corrosion resistance.
General Information
Werkstoff: CC575S (CuZn39Pb1Al) Material: CC575S (CuZn39Pb1Al)
Bericht-Nr.: #2017-751 Report No.: #2017-751
Herstellernummer: PGBA2W / PGNX2W Manufacturer Number: PGBA2W / PGNX2W
EAN: 4250914808858 / 4250914810318 EAN: 4250914808858 / 4250914810318
Analysenbericht XL2-99147 Analysis Report XL2-99147
Messung Nr.: 751 Measurement No.: 751
Modus: Legierungen Mode: Alloys
Messdauer: 4,5s Measurement Duration: 4.5s
Zeit: 02.12.2017 12:12:46 Time: 02.12.2017 12:12:46
Herstellernummer pgba2w Manufacturer Number pgba2w
User Login Marc Manusch User Login Marc Manusch
Werkstoffvorschlag: CC575S_CuZn39Pb1Al Material Suggestion: CC575S_CuZn39Pb1Al
Element Analysis
Kupfer Cu 59,658 ± 0,829 58,000 63,000 Copper Cu 59.658 ± 0.829 58.000 63.000
Zink Zn 38,999 ± 0,731 33,500 41,500 Zinc Zn 38.999 ± 0.731 33.500 41.500
Blei Pb 1,172 ± 0,208 0,200 1,400 Lead Pb 1.172 ± 0.208 0.200 1.400
Eisen Fe 0,149 ± 0,069 0,000 0,300 Iron Fe 0.149 ± 0.069 0.000 0.300
Zinn Sn 0,000 ± 0,153 0,000 0,500 Tin Sn 0.000 ± 0.153 0.000 0.500
Nickel Ni 0,000 ± 0,083 0,000 0,200 Nickel Ni 0.000 ± 0.083 0.000 0.200
Mangan Mn 0,000 ± 0,097 0,000 0,050 Manganese Mn 0.000 ± 0.097 0.000 0.050
Silizium Si 0,000 0,050 Silicon Si 0.000 0.050
Aluminium Al 0,300 0,900 Aluminum Al 0.300 0.900
Contact and Validity Information
Olaf Manusch Geschäftsführer Olaf Manusch Managing Director
Marc Manusch Leitung Technik & Qualitätswesen Marc Manusch Head of Engineering & Quality Management
Klingenbergstr. 12 31139 Hildesheim Klingenbergstr. 12 31139 Hildesheim
Hildesheim, 2. Dezember 2017 Hildesheim, December 2, 2017

PGMW5

[pdf] PGMW5_Anordnungsplan
Title and Brand
Component List

PGWABNX-ARB

[pdf] Analysebericht-PGWABNX
Analysis Report and Product Information
AnalyseberichtAnalysis Report
Die Probe wurde mittels Röntgenfluoreszenzanalyse getestet und hat folgendes Messergebnis erbracht.The sample was tested using X-ray fluorescence analysis and yielded the following measurement result.
Bericht-Nr.: #2022-1320 + 1322Report No.: #2022-1320 + 1322
Herstellernummer: PGWABNX (-AR/-ARB)Manufacturer Number: PGWABNX (-AR/-ARB)
Component: Connection Thread
Bauteil: AnschlussgewindeComponent: Connection Thread
Kupfer Cu 59,426 ± 0,592 57,000 62,000Copper Cu 59.426 ± 0.592 57.000 62.000
Zink Zn 37,609 ± 0,512 33,500 41,000Zinc Zn 37.609 ± 0.512 33.500 41.000
Blei Pb 2,555 ± 0,205 2,500 3,500Lead Pb 2.555 ± 0.205 2.500 3.500
Eisen Fe 0,214 ± 0,055 0,000 0,500Iron Fe 0.214 ± 0.055 0.000 0.500
Zinn Sn 0,139 ± 0,085 0,000 0,300Tin Sn 0.139 ± 0.085 0.000 0.300
Nickel Ni 0,055 ± 0,042 0,000 0,200Nickel Ni 0.055 ± 0.042 0.000 0.200
Component: Cast Body
Bauteil: GusskörperComponent: Cast Body
Kupfer Cu 59,832 ± 1,350 57,000 60,000Copper Cu 59.832 ± 1.350 57.000 60.000
Zink Zn 37,729 ± 1,145 37,000 41,500Zinc Zn 37.729 ± 1.145 37.000 41.500
Blei Pb 2,155 ± 0,415 1,600 2,200Lead Pb 2.155 ± 0.415 1.600 2.200
Eisen Fe 0,283 ± 0,134 0,000 0,300Iron Fe 0.283 ± 0.134 0.000 0.300
Zinn Sn 0,000 ± 0,400 0,000 0,300Tin Sn 0.000 ± 0.400 0.000 0.300
Nickel Ni 0,000 ± 0,113 0,000 0,100Nickel Ni 0.000 ± 0.113 0.000 0.100
Aluminium Al 0,000 0,050Aluminum Al 0.000 0.050
Compliance and Material Information
Der Nachweis über die Eignung in Trinkwasserinstallationen nach Trinkwasserverordnung (TrinkwV 2001) ist somit erbracht.Proof of suitability for drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) has thus been provided.
Das geprüfte Material entspricht den Vorgaben des Umweltbundesamtes bezüglich der „Bewertungsgrundlagen für metallene Werkstoffe im Kontakt mit Trinkwasser“- UBA-Positivliste. Der Werkstoff erfüllt laut Umweltbundesamt die Norm DIN 50930-6, die Aussagen bezüglich der Korrosionsbeständigkeit darlegt.The tested material complies with the requirements of the German Federal Environment Agency (Umweltbundesamt) regarding the "Assessment basis for metallic materials in contact with drinking water" - UBA positive list. According to the German Federal Environment Agency, the material meets the DIN 50930-6 standard, which provides information on corrosion resistance.
Werkstoff: CW614N (CuZn39Pb3) + CW617N (CuZn40Pb2)Material: CW614N (CuZn39Pb3) + CW617N (CuZn40Pb2)
Signatures
Olaf Manusch GeschäftsführerOlaf Manusch Managing Director
Hildesheim, 26. Oktober 2022Hildesheim, October 26, 2022
ppa. Marc Manusch Leitung Technik & Qualitätswesenppa. Marc Manusch Head of Engineering & Quality Assurance
Additional Information
Umweltbundesamt: „Bewertungsgrundlage für metallene Werkstoffe im Kontakt mit Trinkwasser“, (abgerufen am 26.10.2022).German Federal Environment Agency: "Assessment basis for metallic materials in contact with drinking water", (accessed on October 26, 2022).

[PDF] Allgemeine Pflegehinweise
Anwendung: Kalt- und Warmwasserversorgung
Anwendungsbereich: Duschkabine
Farbe: Chrom

1 of 1 reviews

Average rating of 5 out of 5 stars


100%

0%

0%

0%

0%


Leave a review!

Share your experiences with other customers.


1 review

November 14, 2022 - Herbert Rotter 🇩🇪 Deutschland
Verifizierter Kauf

Review with rating of 5 out of 5 stars

Perfect
KI-übersetzt (Originalsprache: de-DE) Original anzeigen
Laden...

3D-Modell wird geladen...

Maus: Drehen | Scrollen: Zoom | Rechtsklick: Verschieben Finger: Drehen | Pinch: Zoom | Zwei Finger: Verschieben