Skip to main content Skip to search Skip to main navigation
Bewertungsdurchschnitt mit

Average rating of 4.9 out of 5 stars

(4.91/5.00) aus insgesamt 2934 Bewertungen

Brass-Bronze

Our finish Brass-Bronze brings back the "Golden Age." It is not just simple gold, but a complex composition of warm bronze tones and dark "Black Nickel." Hand-brushed, it creates a vibrant texture with antique charm and visual depth. Thanks to a robust seal, this noble, nostalgic look remains durable and easy to maintain. keywords:...

Concealed Body

  • Installation depth: 83-108mm
  • Made of solid brass
  • 4-way / 3-way / 2-way / 1-way
  • Integrated level for easy installation
  • With sealing sleeve for waterproofing in composite

Installation Instructions

Connect the consumers according to the following specifications:

2-way fixture:

  • Top outlet: overhead shower
  • Bottom outlet: hand shower

Concealed Thermostat Fixture

  • Made of solid brass
  • High-quality color coating
  • Suitable for 1-3 consumers, e.g., overhead and hand shower, bathtub filler
  • Switching consumers by turning the diverter
  • Required base body PGBASIC
  • Durable thermostat cartridge
  • Safety lock at 38 °C protects against accidentally high temperatures (scalding protection)

Overhead Shower 30cm

  • Made of brass
  • High-quality brass finish
  • Anti-calc nozzles
  • Extra large diameter of 30cm
  • With ball joint

Supply Arm

  • Made of solid brass
  • High-quality color finish
  • Projection approx. 46 cm
  • Height approx. 9 cm
  • Ø pipe 22 mm
  • Ø wall rose 8.5 cm
  • 1/2" thread

Hand Shower

  • Made of solid brass
  • High-quality surface
  • Handle made of ceramic
  • 1 function
  • Anti-calc nozzles
  • Length 21.5 cm
  • Ø head 7.5 cm
  • 1/2" connection

Shower Holder

  • Made of solid brass
  • High-quality color finish
  • Ø 54 mm on the wall
  • 2 drill holes required
  • Angle of the holder adjustable (ball joint)
  • Compatible with all shower hoses

Shower Hose

  • Shower hose in antique brass / bronze look
  • Length 150cm
  • Matches our other accessories
  • 1/2" connections - cone & nut

Versand

  • Versandgewicht: 7.71 Kg
  • Versandart: Paket

Produktsicherheitsverordnung

Angaben zum Hersteller:

Name des Herstellers: PaulGurkes GmbH

Postanschrift: Bördestr. 7, 31135 Hildesheim, Deutschland

Elektronische Adresse: anfrage@paulgurkesshop.de


Letztes Update: 16.04.2026, 20:16:06

Weitere Kundenbilder zu im Set enthaltenen Produkten

PaulGurkes Concealed Body for Faucets up to 4-Way

PGBASIC

€99.00*

PaulGurkes Retro Thermostat for 1-3 Outlets in Brass Finish

PGTHR23W-B

€319.00*

PaulGurkes Retro 30cm Brass Rain Shower

PGHPK7-B

€339.00*

PaulGurkes Vintage Wall Arm Retro Nostalgia Round Curved

PG9R-B

€84.90*

PaulGurkes Shower Holder Antique Bronze

PGHN-B

€49.00*

PaulGurkes Retro Shower Head Handheld Antique Brass

PGHPBHS016-B

€79.90*

PaulGurkes Wall Connector Elbow Hose Connection Brass Antique

PGHPWABR-B

€39.00*

PaulGurkes Nostalgia Antique Shower Hose 150cm

PGHPS-B

€45.90*

Dokumente der im Set enthaltenen Produkte

PGBASIC

[pdf] PGBASIC-v1.2
Components
Nr. Komponente AnzahlNo. Component Quantity
1 Wasserwaage 21 Spirit level 2
2 Pappkarte 12 Cardboard 1
3 Wasserwaagenrahmen 13 Spirit level frame 1
4 Schraube 64 Screw 6
5 Spülvorrichtung 15 Flushing device 1
6 Dichtung für Spülvorrichtung 16 Seal for flushing device 1
8 Dichtmanschette 18 Sealing collar 1
9 Grundkörper 19 Basic body 1
10 Spreizbolzen 410 Expansion bolt 4
11 Innensechskantschlüssel 111 Allen key 1
12 Verschlussstopfen 312 Closure plugs 3
13 Montageanleitung 113 Assembly instructions 1
Zertifikat & Videoanleitung unter: 14 www.PaulGurkesShop.de 1Certificate & video instructions at: 14 www.PaulGurkesShop.de 1
Installation Preparation
Installationsvorbereitung • Für die Installation der Box wird ein Loch von mindestens 200mm x 220mm benötigt. • Die Einbautiefe beträgt 83mm - 108mm. • Bereiten Sie die Leitungen wie in der folgenden Abbildung vor. • Der Druck sollte 0,5 - 10 Bar nicht überschreiten. Empfohlener Druck ist 5 Bar.Installation preparation • A hole of at least 200mm x 220mm is required to install the box. • The installation depth is 83mm - 108mm. • Prepare the pipes as shown in the following figure. • The pressure should not exceed 0.5 - 10 bar. Recommended pressure is 5 bar.
Installation Step - Preparation
1. Installationsschritt - Vorbereitung • Merke: Die Box ist standardmäßig für vier Ausgänge konfiguriert. Für eine Nutzung von einem / zwei oder drei Ausgängen blockieren Sie die Ausgänge wie im unteren Schaubild abgebildet. • Bohren Sie die Installationslöcher, wie in der Abbildung zu sehen ist. • Platzieren Sie nun die Box in dem Installationsloch und fixieren Sie diese mit den Spreizschrauben. • Für die Installation in eine Ständerwand montieren Sie die Box wie im oberen Schaubild. • Überprüfen Sie die Festigkeit der Schrauben. • Schließen Sie die Warmwasser und Kaltwasser Leitungen an. • Schließen Sie die Verbraucher nach dem unteren Schaubild an.1. Installation step - Preparation • Note: The box is configured for four outlets as standard. For use with one / two or three outlets, block the outlets as shown in the diagram below. • Drill the installation holes as shown in the figure. • Now place the box in the installation hole and fix it with the expansion screws. • For installation in a stud wall, mount the box as shown in the diagram above. • Check the tightness of the screws. • Connect the hot and cold water pipes. • Connect the consumers according to the diagram below.
Installation Step - Function Overview
2. Installationsschritt - Funktionsübersicht2. Installation step - Function overview
Important Notes
WICHTIG! • Der untere Ausgang wird zuerst angesteuert (bei 2-Wege Armaturen). • Überprüfen Sie die Richtigkeit der Ausgänge an den Verbrauchern vor dem Verputzen in Abhängigkeit der zur Verwendung geplanten Armatur!IMPORTANT! • The lower outlet is activated first (for 2-way fittings). • Check that the outlets are correct for the consumers before plastering, depending on the fitting you plan to use!
Installation Step - Testing
2. Installationsschritt - Testen • Öffnen Sie die Wasserleitungen und prüfen Sie die Montage auf Dichtheit. • Demontieren Sie die Spülvorrichtung und entfernen Sie die Gummistopfen aus dem Grundkörper. • Montieren Sie die Verschlusskappe erneut und spülen Sie 3 Minuten die Leitungen, um diese von Verschmutzungen zu säubern.2. Installation step - Testing • Open the water pipes and check the installation for leaks. • Dismantle the flushing device and remove the rubber plugs from the main body. • Reassemble the cap and flush the pipes for 3 minutes to remove any dirt.
Installation Step - Plastering
3. Installationsschritt - Verputzen • Wenn die Installation die Dichtheitsprüfung bestanden hat, verputzen Sie die Montage. • Kontrollieren Sie die Position der Box. • Dichten Sie nun die Box im Verbund ab, bevor Sie die Fließen an die Wand bringen. • Verfliesen Sie die Installation. • Schneiden Sie das überstehende Material der Box ab. • Dichten Sie zuletzt die Schnittkante ab. • Die Installation ist abgeschlossen. Montieren Sie nun die Armatur.3. Installation step - Plastering • If the installation has passed the leak test, plaster the assembly. • Check the position of the box. • Now seal the box in the composite before you bring the tiles to the wall. • Tile the installation. • Cut off the overhanging material of the box. • Finally, seal the cut edge. • The installation is complete. Now mount the fitting.
Important Legal Information
WICHTIG! • Beachten Sie bei der Installation alle erforderlichen gesetzlichen und nationalen Bestimmungen (anerkannte Regeln der Technik) und halten Sie diese ein.IMPORTANT! • When installing, observe all the necessary legal and national regulations (recognized rules of technology) and adhere to them.
[pdf] PGBASIC-Anschlussplan-v1.0
Anschlussplan für PGBASICConnection diagram for PGBASIC
MontagehinweiseInstallation instructions
HinweiseNotes
Beachten Sie bei der Montage unbedingt die beiliegenden Installationsanleitungen.When installing, be sure to observe the enclosed installation instructions.
Prüfen Sie die Montage unbedingt vor dem Fliesenlegen auf Korrektheit der Verbraucher!Check the installation before tiling to ensure the consumer unit is correct!
Prüfen Sie die Montage des Grundkörpers in Hinsicht auf die zur Verwendung geplanten Komponenten.Check the installation of the base unit with regard to the components planned for use.
Duschsystem 2-Wege2-way shower system
Duschsystem 3-Wege3-way shower system
Wasserfall DuschsystemWaterfall shower system
Wannenset 2-Wege2-way tub set
Duschsystem 4-Wege4-way shower system
WanneneinlaufTub inlet
RegenduscheRain shower
HandbrauseHand shower
RegenfallRainfall
geblocktblocked
WasserfallWaterfall
Verbraucher 4Consumer 4
[pdf] PGBASIC-Durchflussmengen
Flow Rates for PGBASIC
Durchflussmengen für PGBASICFlow Rates for PGBASIC
Durchflussmengen in l/minFlow rates in l/min
Single Lever Mixer (2-Way)
Einhandmischer (2-Wege)Single Lever Mixer (2-Way)
Bar Ausgang Warm Gemisch KaltBar Outlet Warm Mixed Cold
B 9,5 10,3 8,8B 9.5 10.3 8.8
1 D 9,6 10,6 8,91 D 9.6 10.6 8.9
B 16,7 18,3 15,4B 16.7 18.3 15.4
3 D 17 18,7 15,73 D 17 18.7 15.7
Thermostat Fittings (2-Way + 3-Way)
Thermostatarmaturen (2-Wege + 3-Wege)Thermostat Fittings (2-Way + 3-Way)
Bar Ausgang Warm Gemisch KaltBar Outlet Warm Mixed Cold
B 8 12,2 9,3B 8 12.2 9.3
1 C 8 12 9,21 C 8 12 9.2
D 7,8 12,5 9D 7.8 12.5 9
B 14,2 22,3 16,5B 14.2 22.3 16.5
3 C 14 21,8 16,33 C 14 21.8 16.3
D 14,6 22,5 16,6D 14.6 22.5 16.6
Selector Fittings (2-Way + 3-Way)
Selectarmaturen (2-Wege + 3-Wege)Selector Fittings (2-Way + 3-Way)
Bar Ausgang Warm Gemisch KaltBar Outlet Warm Mixed Cold
B 14,6 17,4 14,6B 14.6 17.4 14.6
3 C 16,5 20,2 16,93 C 16.5 20.2 16.9
D 15,6 18,6 15,9D 15.6 18.6 15.9
Single Lever Mixer (4-Way)
Einhandmischer (4-Wege)Single Lever Mixer (4-Way)
Bar Ausgang Warm Gemisch KaltBar Outlet Warm Mixed Cold
A 9,3 10,3 9,8A 9.3 10.3 9.8
B 9,2 10,2 9,7B 9.2 10.2 9.7
1 C 9,4 10,4 9,81 C 9.4 10.4 9.8
D 9,7 10,7 10D 9.7 10.7 10
A 16,8 18,7 17,8A 16.8 18.7 17.8
B 16,6 18,5 17,6B 16.6 18.5 17.6
3 C 16,8 18,7 17,83 C 16.8 18.7 17.8
D 17,3 19,5 18,3D 17.3 19.5 18.3
[pdf] Analysebericht-PGBASIC
Analysis Report
AnalyseberichtAnalysis Report
Die Probe wurde mittels Röntgenfluoreszenzanalyse getestet und hat folgendes Messergebnis erbracht.The sample was tested using X-ray fluorescence analysis and yielded the following measurement result.
Report Information
Bericht-Nr.: #2017-749Report No.: #2017-749
Herstellernummer: PGBASICManufacturer number: PGBASIC
Material Composition
Kupfer Cu 58,679 ± 0,573 57,000 60,000Copper Cu 58.679 ± 0.573 57.000 60.000
Zink Zn 39,262 ± 0,512 37,000 41,500Zinc Zn 39.262 ± 0.512 37.000 41.500
Blei Pb 1,727 ± 0,173 1,600 2,200Lead Pb 1.727 ± 0.173 1.600 2.200
Eisen Fe 0,153 ± 0,049 0,000 0,300Iron Fe 0.153 ± 0.049 0.000 0.300
Zinn Sn 0,114 ± 0,074 0,000 0,300Tin Sn 0.114 ± 0.074 0.000 0.300
Nickel Ni 0,064 ± 0,041 0,000 0,100Nickel Ni 0.064 ± 0.041 0.000 0.100
Aluminium Al 0,000 0,050Aluminum Al 0.000 0.050
Compliance and Standards
Der Nachweis über die Eignung in Trinkwasserinstallationen nach Trinkwasserverordnung (TrinkwV 2001) ist somit erbracht.The proof of suitability for drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) is thus provided.
Das geprüfte Material entspricht den Vorgaben des Umweltbundesamtes bezüglich der „Bewertungsgrundlagen für metallene Werkstoffe im Kontakt mit Trinkwasser“- UBA- Positivliste. Der Werkstoff erfüllt laut Umweltbundesamt die Norm DIN 50930-6, die Aussagen bezüglich der Korrosionsbeständigkeit darlegt.The tested material complies with the requirements of the Federal Environment Agency regarding the "Assessment criteria for metallic materials in contact with drinking water" - UBA positive list. According to the Federal Environment Agency, the material meets the DIN 50930-6 standard, which provides information on corrosion resistance.
Material Identification
Werkstoff: CW617N (CuZn40Pb2)Material: CW617N (CuZn40Pb2)
Signatures
Olaf Manusch GeschäftsführerOlaf Manusch Managing Director
Hildesheim, 2. Dezember 2017Hildesheim, December 2, 2017
Marc Manusch Leitung Technik & QualitätswesenMarc Manusch Head of Technology & Quality Assurance
Legal Note
Umweltbundesamt: „Bewertungsgrundlage für metallene Werkstoffe im Kontakt mit Trinkwasser“, (abgerufen am 03.04.2017).Federal Environment Agency: "Assessment basis for metallic materials in contact with drinking water", (accessed on 04/03/2017).
[pdf] PGBASIC_Anordnungsplan
Komponentenliste
Sonstiges
Produktanleitungen - PGBASIC - Version 1
Connection Diagram for PGBASIC
Connection Diagram for PGBASIC v1.0 of 1
Installation Instructions
Installation Instructions Be sure to follow the included installation instructions during assembly.
Check the assembly carefully before tiling to ensure correct placement of the consumers!
Check the assembly of the basic body with regard to the components planned for use.
Notes
Notes Hand shower blocked blocked
Rain shower hand shower blocked
Rain shower bathtub inlet hand shower blocked blocked
Bathtub inlet rain waterfall hand shower blocked
Shower system 3-way
Shower system 2-way bathtub set 2-way waterfall
Shower system shower system 4-way hand shower rain shower bathtub inlet consumer 4
Produktanleitungen - PGBASIC - Version 1.2
Analyseberichte - PGBASIC - Version 1
Product Information
Produktname: PaulGurkes Unterputz Grundkörper für Armaturen bis 4-Wege Product Name: PaulGurkes In-Wall Rough-In Body for Fixtures up to 4-Way
Artikelnummer: PGBASIC Article Number: PGBASIC
Version: v1.2 Version: v1.2
Components
1 - Wasserwaage - 2 1 - Spirit Level - 2
2 - Pappkarte - 1 2 - Cardboard Card - 1
3 - Wasserwaagenrahmen - 1 3 - Spirit Level Frame - 1
4 - Schraube - 6 4 - Screw - 6
5 - Spülvorrichtung - 1 5 - Flush Device - 1
6 - Dichtung für Spülvorrichtung - 1 6 - Seal for Flush Device - 1
7 - Pin - 2 7 - Pin - 2
8 - Dichtmanschette - 1 8 - Sealing Cuff - 1
9 - Grundkörper - 1 9 - Rough-In Body - 1
10 - Spreizbolzen - 4 10 - Expansion Bolt - 4
11 - Innensechskantschlüssel - 1 11 - Hex Key - 1
12 - Verschlussstopfen - 3 12 - Closure Plug - 3
13 - Montageanleitung - 1 13 - Assembly Instructions - 1
14 - Zertifikat & Videoanleitung unter: www.PaulGurkesShop.de 14 - Certificate & Video Instructions at: www.PaulGurkesShop.de
Installation Preparation
Für die Installation der Box wird ein Loch von mindestens 200mm x 220mm benötigt. A hole of at least 200 mm x 220 mm is required for box installation.
Die Einbautiefe beträgt 83mm - 108mm. Installation depth is 83 mm - 108 mm.
Bereiten Sie die Leitungen wie in der folgenden Abbildung vor. Prepare the lines as shown in the following figure.
Der Druck sollte 0,5 - 10 Bar nicht überschreiten. Empfohlener Druck ist 5 Bar. Pressure should not exceed 0.5 - 10 bar. Recommended pressure is 5 bar.
Step 1 of Installation - Preparation
Die Box ist standardmäßig für vier Ausgänge konfiguriert. Für eine Nutzung von einem / zwei oder drei Ausgängen blockieren Sie die Ausgänge wie im unteren Schaubild abgebildet. The box is configured by default for four outlets. For use of one, two, or three outlets, block the outlets as shown in the diagram below.
Bohren Sie die Installationslöcher, wie in der Abbildung zu sehen ist. Drill the installation holes as shown in the illustration.
Platzieren Sie nun die Box in dem Installationsloch und fixieren Sie diese mit den Spreizschrauben. Now place the box in the installation hole and secure it with the expansion bolts.
Für die Installation in eine Ständerwand montieren Sie die Box wie im oberen Schaubild. For installation in a stud wall, mount the box as shown in the upper diagram.
Überprüfen Sie die Festigkeit der Schrauben. Check the tightness of the screws.
Analysis Report
Analysebericht The sample was tested using X-ray fluorescence analysis and produced the following measurement result. The suitability of the product for use in drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) is thus proven. The tested material meets the requirements of the German Federal Environment Agency (UBA) concerning "Assessment bases for metallic materials in contact with drinking water" – UBA positive list. The material complies with DIN 50930-6 standard according to the German Federal Environment Agency, which provides statements regarding corrosion resistance.
Material and Designation
Material: CW617N (CuZn40Pb2)
Manufacturer Number: PGBASIC
EAN: 4250914808827
Report No.: #2017-749
Measurement Results
Analysis Report: XL2-99147
Measurement No.: 749
Mode: Alloys
Measurement Duration: 8.6s
Time: 02.12.2017 11:48:23
Manufacturer Number: pgbasic
Material Suggestion: CW617N_CuZn40Pb2
Element Analysis
Element % ± 2σ Min Max
Copper Cu 58.679 ± 0.573 57.000 60.000
Zinc Zn 39.262 ± 0.512 37.000 41.500
Lead Pb 1.727 ± 0.173 1.600 2.200
Iron Fe 0.153 ± 0.049 0.000 0.300
Tin Sn 0.114 ± 0.074 0.000 0.300
Nickel Ni 0.064 ± 0.041 0.000 0.100
Aluminum Al 0.000 0.050
Signatory and Contact
Signatory: Olaf Manusch, Managing Director
Engineering and Quality Management: Marc Manusch, Engineering and Quality Management
Company: PaulGurkes GmbH, Klingenbergstr. 12, 31139 Hildesheim
User Login: Marc Manusch
Date: Hildesheim, December 2, 2017
Anordnungspläne - PGBASIC - Version 1
Components
1 8PM4X16 1 8PM4X16
2 81BE0000 2 81BE0000
3 80BE0000 3 80BE0000
4 8J128X18A 4 8J128X18A
5 81T23187 5 81T23187
6 85BK001 6 85BK001
7 82BE0000 7 82BE0000
8 8J103X16A 8 8J103X16A
9 8XJBE001 9 8XJBE001
10 84BE0000 10 84BE0000
11 8PM5X12 11 8PM5X12
12 85BE0000 12 85BE0000
13 103BE000 13 103BE000
14 88BM0000 14 88BM0000
15 8XJBE002 15 8XJBE002
16 83BE0000 16 83BE0000
17 8JT1A2D2 17 8JT1A2D2
18 8J22X24A 18 8J22X24A
19 8BS40X112 19 8BS40X112
20 8STG605 20 8STG605
Temperature Ranges
Max Mixed Cold Hot 108 Max Mixed Cold Hot 108
Min Mixed Mixed Mixed 80 Min Mixed Mixed Mixed 80
Manufacturer
PaulGurkes GmbH PaulGurkes GmbH
Sonstige Dokumente - PGBASIC - Version 1
Flow Rates for PGBASIC
v1.0 v1.0
Thermostatic Mixers (2-way + 3-way)
Bar Outlet Hot Water Mixed Cold Water
1 B 8 12,2 9,3
1 C 8 12 9,2
1 D 7,8 12,5 9
3 B 14,2 22,3 16,5
3 C 14 21,8 16,3
3 D 14,6 22,5 16,6
Single-Lever Mixer (2-way)
Bar Outlet Hot Water Mixed Cold Water
1 B 9,5 10,3 8,8
1 D 9,6 10,6 8,9
3 B 16,7 18,3 15,4
3 D 17 18,7 15,7
Select Mixers (2-way + 3-way)
Bar Outlet Hot Water Mixed Cold Water
3 B 14,6 17,4 14,6
3 C 16,5 20,2 16,9
3 D 15,6 18,6 15,9
Single-Lever Mixer (4-way)
Bar Outlet Hot Water Mixed Cold Water
1 A 9,3 10,3 9,8
1 B 9,2 10,2 9,7
1 C 9,4 10,4 9,8
1 D 9,7 10,7 10
3 A 16,8 18,7 17,8
3 B 16,6 18,5 17,6
3 C 16,8 18,7 17,8
3 D 17,3 19,5 18,3

PGTHR23W-B

[pdf] PGTHR23W-B
Components
Nr. Komponente Anzahl 1 Kappe 1 2 Schraube 2 3 Griff 1 4 Pin 1 5 Blende 1 6 Dichtung 2 7 Schraube 4 8 Fliesenspiegel 1 9 Dichtung 1 10 Armatur 1 11 Dichtungen 7 12 Schlüssel * 1 13 Anleitung 1 14 Zertifikat unter: www.paulgurkesshop.de 1 15 Schlüssel 2 *optionalNo. Component Quantity 1 Cap 1 2 Screw 2 3 Handle 1 4 Pin 1 5 Escutcheon 1 6 Seal 2 7 Screw 4 8 Tile mirror 1 9 Seal 1 10 Fitting 1 11 Seals 7 12 Key * 1 13 Instructions 1 14 Certificate under: www.paulgurkesshop.de 1 15 Key 2 *optional
Grundkörper Anschlussplan
Grundkörper Anschlussplan • Die Armatur steuert die Ausgänge B + C + D an. • Der Ausgang A wird nicht angesteuert. • Nicht benötigte Ausgänge müssen druckfest verschlossen sein. • Die Armatur kann 1-3 Verbraucher ansteuern.Basic Body Connection Plan • The fitting controls outputs B + C + D. • Output A is not controlled. • Unneeded outputs must be pressure-tightly sealed. • The fitting can control 1-3 devices.
Installationsschritte
Installationsschritte • Nach der Installation der Unterputz-Box und Prüfung auf Dichtheit ist das Wasser abzustellen. • Entfernen Sie den Schutz der Box. Montieren Sie die Armatur wie im zweiten Schaubild. • Ziehen Sie die Schrauben fest an, vergessen Sie die O-Ringe nicht. • Montieren Sie nun die Abdeckungen wie im dritten Bild. Justieren Sie die Abdeckung, bevor Sie diese fixieren. • Installieren Sie die Blende der Armatur wie im letzten Installationsbild. • Montieren Sie nun den Rest der Armatur.Installation Steps • After installing the concealed box and checking for leaks, turn off the water. • Remove the box protection. Mount the fitting as shown in the second picture. • Tighten the screws firmly, do not forget the O-rings. • Now mount the covers as shown in the third picture. Adjust the cover before fixing it. • Install the fitting escutcheon as shown in the last installation picture. • Now mount the rest of the fitting.
Temperatur regeln
Temperatur regeln • Regeln Sie die Temperatur wie im unteren Schaubild.Regulate temperature • Regulate the temperature as shown in the figure below.
Ausgänge schalten
Ausgänge schalten • Schalten Sie die Ausgänge der Armatur wie im folgenden Schaubild.Switch outputs • Switch the outputs of the fitting as shown in the following diagram.
Säuberung & Wartung
Säuberung & Wartung Um eine gleichbleibende Qualität zu gewährleisten, ist folgendes zu beachten: • Mit sauberem Wasser abspülen & mit Mikrofasertuch trocknen. • Schmutz nur mit milden Reinigungsmitteln entfernen. • Benutzen Sie keine Scheuermilch, Polierpaste, Papiertücher, etc. • Benutzen Sie keine säurehaltigen Reinigungsmittel oder Seife.Cleaning & Maintenance In order to guarantee consistent quality, the following must be observed: • Rinse with clean water & dry with microfiber cloth. • Only remove dirt with mild detergents. • Do not use scouring milk, polishing paste, paper towels, etc. • Do not use any acidic cleaning agents or soap.
PaulGurkes Qualität
PaulGurkes Qualität • Herzlichen Glückwunsch zum Kauf Ihres PaulGurkes Qualitätsproduktes. Unsere Produkte sind technisch ausgereift und unter Verwendung hochwertiger Materialien gefertigt. • Jedes Produkt unterzieht sich einer handverlesenen Qualitätskontrolle. • Sollten Sie mit unseren Produkten nicht zufrieden sein, kontaktieren Sie uns.PaulGurkes Quality • Congratulations on purchasing your PaulGurkes quality product. Our products are technically sophisticated and manufactured using high-quality materials. • Each product undergoes a hand-picked quality control. • If you are not satisfied with our products, please contact us.
Wir behalten uns das Recht vor, Aktualisierungen, Änderungen oder Ergänzungen an den bereitgestellten Informationen und Daten vorzunehmen.We reserve the right to make updates, changes or additions to the information and data provided.

PGHPWABR-B

[pdf] Analysebericht-PGHPWABR-B
Analysis Report Header
AnalyseberichtAnalysis Report
Die Probe wurde mittels Röntgenfluoreszenzanalyse getestet und hat folgendes Messergebnis erbracht.The sample was tested using X-ray fluorescence analysis and yielded the following measurement result.
Bericht-Nr.:Report No.:
Herstellernummer:Manufacturer Number:
Elemental Analysis
KupferCopper
58,486 ± 2,11958.486 ± 2.119
57,00057.000
60,00060.000
ZinkZinc
39,196 ± 1,87039.196 ± 1.870
37,00037.000
41,50041.500
BleiLead
2,148 ± 0,6832.148 ± 0.683
1,6001.600
2,2002.200
ZinnTin
0,000 ± 0,4020.000 ± 0.402
0,0000.000
0,3000.300
0,000 ± 0,1240.000 ± 0.124
0,1000.100
EisenIron
0,000 ± 0,2850.000 ± 0.285
AluminiumAluminum
0,0500.050
Compliance and Material Information
Der Nachweis über die Eignung in Trinkwasserinstallationen nach Trinkwasserverordnung (TrinkwV 2001) ist somit erbracht.The verification of suitability in drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) has thus been provided.
Das geprüfte Material entspricht den Vorgaben des Umweltbundesamtes bezüglich der „Bewertungsgrundlagen für metallene Werkstoffe im Kontakt mit Trinkwasser“- UBA-Positivliste. Der Werkstoff erfüllt laut Umweltbundesamt die Norm DIN 50930-6, die Aussagen bezüglich der Korrosionsbeständigkeit darlegt.The tested material complies with the requirements of the German Environment Agency (Umweltbundesamt) regarding the "assessment basis for metallic materials in contact with drinking water" - UBA positive list. According to the German Environment Agency, the material meets the DIN 50930-6 standard, which provides information on corrosion resistance.
Werkstoff: CW617N (CuZn40Pb2)Material: CW617N (CuZn40Pb2)
Signatures and Date
Olaf Marmusch GeschäftsführerOlaf Marmusch Managing Director
Hildesheim, Montag, 3. April 2017Hildesheim, Monday, April 3, 2017
Marc Manusch Leitung Technik & QualitätswesenMarc Manusch Head of Engineering & Quality Assurance
Reference to German Environment Agency
Umweltbundesamt: „Bewertungsgrundlage für metallene Werkstoffe im Kontakt mit Trinkwasser“, (abgerufen am 03.04.2017).German Environment Agency: "Assessment basis for metallic materials in contact with drinking water", (accessed on April 3, 2017).
Analyseberichte - PGHPWABR-B - Version 1
Analysis Report
PaulGurkes GmbH Klingenbergstr. 12 31139 Hildesheim PaulGurkes GmbH Klingenbergstr. 12 31139 Hildesheim
XL2-99147 XL2-99147
Measurement No.: 726 Messung Nr.: 726
Mode: Alloys Modus: Legierungen
Measurement Duration: 0.9s Messdauer: 0,9s
Time: 29.09.2017 18:00:35 Zeit: 29.09.2017 18:00:35
Manufacturer Number: pghpwabr - b - body Herstellernummer pghpwabr - b - body
User Login: Marc Manusch User Login Marc Manusch
Material Suggestion: CW617N_CuZn40Pb2 Werkstoffvorschlag: CW617N_CuZn40Pb2
Element Analysis
Copper Cu 58.486 ± 2.119 57.000 60.000 Kupfer Cu 58,486 ± 2,119 57,000 60,000
Zinc Zn 39.196 ± 1.870 37.000 41.500 Zink Zn 39,196 ± 1,870 37,000 41,500
Lead Pb 2.148 ± 0.683 1.600 2.200 Blei Pb 2,148 ± 0,683 1,600 2,200
Tin Sn 0.000 ± 0.402 0.000 0.300 Zinn Sn 0,000 ± 0,402 0,000 0,300
Nickel Ni 0.000 ± 0.124 0.000 0.100 Nickel Ni 0,000 ± 0,124 0,000 0,100
Iron Fe 0.000 ± 0.285 0.000 0.300 Eisen Fe 0,000 ± 0,285 0,000 0,300
Aluminium Al 0.000 0.050 Aluminium Al 0,000 0,050
* Please provide text here. * * Bitte hier Text angeben. *
Analyseberichte - PGHPWABR-B - Version 1
Analysis Report
Die Probe wurde mittels Röntgenfluoreszenzanalyse getestet und hat folgendes Messergebnis erbracht. Der Nachweis über die Eignung in Trinkwasserinstallationen nach Trinkwasserverordnung (TrinkwV 2001) ist somit erbracht. Das geprüfte Material entspricht den Vorgaben des Umweltbundesamtes bezüglich der „Bewertungsgrundlagen für metallene Werkstoffe im Kontakt mit Trinkwasser"- UBA-Positivliste. Der Werkstoff erfüllt laut Umweltbundesamt die Norm DIN 50930-6, die Aussagen bezüglich der Korrosionsbeständigkeit darlegt. The sample was tested using X-ray fluorescence analysis and yielded the following measurement result. Proof of suitability for drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) is thus established. The tested material complies with the requirements of the German Federal Environment Agency (Umweltbundesamt) regarding "evaluation criteria for metallic materials in contact with drinking water" - UBA positive list. According to the Federal Environment Agency, the material meets the DIN 50930-6 standard, which provides statements on corrosion resistance.
Material and Identification
Werkstoff: CW617N (CuZn40Pb2) Material: CW617N (CuZn40Pb2)
Bericht-Nr.: #2017-726 Report No.: #2017-726
Herstellernummer: PGHPWABR-B Manufacturer Number: PGHPWABR-B
EAN: 4250914808803 EAN: 4250914808803
Measurement Results
Analysenbericht: XL2-99147 Analysis Report: XL2-99147
Messung Nr.: 726 Measurement No.: 726
Modus: Legierungen Mode: Alloys
Messdauer: 0,9s Measurement Duration: 0.9s
Zeit: 29.09.2017 18:00:35 Time: 29.09.2017 18:00:35
Herstellernummer: pghpwabr-b-body Manufacturer Number: pghpwabr-b-body
Werkstoffvorschlag: CW617N_CuZn40Pb2 Material Suggestion: CW617N_CuZn40Pb2
Element Analysis
Element Element
% %
± 2σ ± 2σ
Min Min
Analyseberichte - PGHPWABR-B - Version 1
Manufacturer Information
Herstellerinformation
PaulGurkes GmbH
Klingenbergstr. 12
31139 Hildesheim
Analysis Report
Analysenbericht
XL2-99147
Measurement No.: 677
Mode: Alloys
Measurement Duration: 3.1s
Time: 29.09.2017 17:33:44
Material Information
Werkstoffinformation
Manufacturer Number: pghpwabr - body
Material Suggestion: CW617N_CuZn40Pb2
User Login: Marc Manusch
Element Analysis
Elementanalyse
Element: Copper Cu | %: 57.954 | ±2σ: ±1.050 | Min: 57.000 | Max: 60.000
Element: Zinc Zn | %: 39.749 | ±2σ: ±0.929 | Min: 37.000 | Max: 41.500
Element: Lead Pb | %: 1.944 | ±2σ: ±0.316 | Min: 1.600 | Max: 2.200
Element: Iron Fe | %: 0.329 | ±2σ: ±0.111 | Min: 0.000 | Max: 0.300
Element: Tin Sn | %: 0.000 | ±2σ: ±0.249 | Min: 0.000 | Max: 0.300
Element: Nickel Ni | %: 0.000 | ±2σ: ±0.091 | Min: 0.000 | Max: 0.100
Element: Aluminium Al | Min: 0.000 | Max: 0.050
Notes
Hinweise
* Please enter text here. *
Analyseberichte - PGHPWABR-B - Version 1
Analysis Report
Die Probe wurde mittels Röntgenfluoreszenzanalyse getestet und hat folgendes Messergebnis erbracht. Der Nachweis über die Eignung in Trinkwasserinstallationen nach Trinkwasserverordnung (TrinkwV 2001) ist somit erbracht. The sample was tested using X-ray fluorescence analysis and yielded the following measurement result. Evidence of suitability for drinking water installations according to the Drinking Water Ordinance (TrinkwV 2001) has thus been established.
Das geprüfte Material entspricht den Vorgaben des Umweltbundesamtes bezüglich der „Bewertungsgrundlagen für metallene Werkstoffe im Kontakt mit Trinkwasser"- UBA-Positivliste. Der Werkstoff erfüllt laut Umweltbundesamt die Norm DIN 50930-6, die Aussagen bezüglich der Korrosionsbeständigkeit darlegt. The tested material complies with the requirements of the Federal Environmental Agency (UBA) regarding "Assessment criteria for metallic materials in contact with drinking water" - UBA positive list. According to the Federal Environmental Agency, the material meets the DIN 50930-6 standard, which establishes requirements for corrosion resistance.
Material
CW617N (CuZn40Pb2) CW617N (CuZn40Pb2)
Product Information
Bericht-Nr.: #2017-677 Report No.: #2017-677
Herstellernummer: PGHPWABR Manufacturer No.: PGHPWABR
EAN: 4250914808797 EAN: 4250914808797
Measurement Data
Messung Nr.: 677 Measurement No.: 677
Modus: Legierungen Mode: Alloys
Messdauer: 3,1s Measurement Duration: 3.1s
Zeit: 29.09.2017 17:33:44 Time: 29.09.2017 17:33:44
Werkstoffvorschlag: CW617N_CuZn40Pb2 Material Suggestion: CW617N_CuZn40Pb2
Element Analysis
Kupfer Cu: 57,954 ± 1,050 (Min: 57,000, Max: 60,000) Copper Cu: 57.954 ± 1.050 (Min: 57.000, Max: 60.000)
Zink Zn: 39,749 ± 0,929 (Min: 37,000, Max: 41,500) Zinc Zn: 39.749 ± 0.929 (Min: 37.000, Max: 41.500)
Blei Pb: 1,944 ± 0,316 (Min: 1,600, Max: 2,200) Lead Pb: 1.944 ± 0.316 (Min: 1.600, Max: 2.200)
Eisen Fe: 0,329 ± 0,111 (Min: 0,000, Max: 0,300) Iron Fe: 0.329 ± 0.111 (Min: 0.000, Max: 0.300)
Zinn Sn: 0,000 ± 0,249 (Min: 0,000, Max: 0,300) Tin Sn: 0.000 ± 0.249 (Min: 0.000, Max: 0.300)
Nickel Ni: 0,000 ± 0,091 (Min: 0,000, Max: 0,100) Nickel Ni: 0.000 ± 0.091 (Min: 0.000, Max: 0.100)
Aluminium Al: 0,000 (Max: 0,050) Aluminum Al: 0.000 (Max: 0.050)
Signatories
Olaf Manusch - Geschäftsführer Olaf Manusch - Managing Director
Marc Manusch - Leitung Technik & Qualitätswesen Marc Manusch - Head of Engineering & Quality Management
Company
PaulGurkes GmbH PaulGurkes GmbH
Klingenbergstr. 12 Klingenbergstr. 12
31139 Hildesheim 31139 Hildesheim
Date
Hildesheim, Montag, 3. April 2017 Hildesheim, Monday, April 3, 2017

[PDF] Allgemeine Pflegehinweise
Farbe: Messing

0 of 0 reviews

Average rating of 0 out of 5 stars

Leave a review!

Share your experiences with other customers.


Laden...

3D-Modell wird geladen...

Maus: Drehen | Scrollen: Zoom | Rechtsklick: Verschieben Finger: Drehen | Pinch: Zoom | Zwei Finger: Verschieben